Showing posts with label #8. Show all posts
Showing posts with label #8. Show all posts

Friday, March 3, 2017

SR: PRODUCTION SCHEDULE Update #8

This is the 8th update of the production schedule I created. It includes the tasks that we have completed so far, and the ones which are still to be completed. I always like to use color coding since it gives me a great overview of what still needs to be done. 
After last time it hasn't changed much, except for the fact that I have added the final dates up until the final cut of our music video. 


SR: Rough Cut 8

This is the 8th rough cut in, which I focused on getting the final beat drop done with editing, by cutting it to 4 milliseconds per shot and then adding in the drums color powder scene in between. A challenge was to get it completely synced to the song and also sync the moment the drummer hits the drum to the beat.